Our team can design a culvert or bridge crossing in order to comply with the OPW Section 50 Consent requirements. This may include:

  • Site surveying of watercourse and existing bridges or culverts
  • Hydrological assessment of watercourse and determine the 1 in 100 year flow
  • Hydraulic Assessment of Proposed Bridge or Culvert
  • Reporting and Preparation of Design Drawings
HY05