Our team can design a culvert or bridge crossing in order to comply with the OPW Section 50 Consent requirements. This may include:
- Site surveying of watercourse and existing bridges or culverts
- Hydrological assessment of watercourse and determine the 1 in 100 year flow
- Hydraulic Assessment of Proposed Bridge or Culvert
- Reporting and Preparation of Design Drawings
